125 mm in 3 hours. One of the heaviest downpours ever. Dan was very lucky to not just survive but retrieve his motorbike from the creek. Thanks and congratulations are due to the people who managed the last batch of roadworks. The top road has held up really well, even with some blocked pipes. The cement survived fine, the other steep bit did well with the new drainage from the quarry, the shaping and guttering all worked well. The top road concrete crossing was crossable yesterday morning. Our road looks much better than the council one. Now if we can only get a chance to put the same good designing to work on the front crossing, we'll have as good an access as is possible!